#Railnatter Episode 214: Finishing The Borders Railway (with maps and routes) episode artwork

EPISODE · May 8, 2024 · 1H 26M

#Railnatter Episode 214: Finishing The Borders Railway (with maps and routes)

from #Railnatter · host Gareth Dennis

This one has been in the pipeline a while... Should we reopen the full Waverley Route from Tweedbank south to Carlisle? No! We shouldn't! I'll explain precisely how we shouldn't, using maps, showing the route that any new Borders Main Line should take, and explaining how and why you'd choose between the two available options. I might even tell you how much it would cost! Enjoyed this? Please do consider supporting #Railnatter at https://patreon.com/garethdennis or throw loose change at me via https://paypal.me/garethdennis. Merch at https://garethdennis.co.uk/merch. Join in the discussion at https://garethdennis.co.uk/discord.

Episode metadata supplied by the publisher feed · Published May 8, 2024

Embed this episode

NOW PLAYING

#Railnatter Episode 214: Finishing The Borders Railway (with maps and routes)

0:00 1:26:20

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of #Railnatter?

This episode is 1 hour and 26 minutes long.

When was this #Railnatter episode published?

This episode was published on May 8, 2024.

Can I download this #Railnatter episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!