#RailNatter Episode 83: How do you fit bigger trains on the British railway network? episode artwork

EPISODE · Oct 13, 2021 · 1H 51M

#RailNatter Episode 83: How do you fit bigger trains on the British railway network?

from #Railnatter · host Gareth Dennis

I'm in a work whirlwind this week, so how better to unwind than to **checks notes** relive past trauma and tell you all about how whole-route gauge clearance projects work? Through the lens of a reasonably recent project, this week's #RailNatter will be a sample of my day job through the lens of the Yorkshire Terminals Gauging project, looking at how it resulted in a clear path for the largest* container trains between Doncaster and Leeds. Join LIVE at 7pm on Wednesday! *actually, W12 doesn't quite cover everything, but more on that in the episode! Enjoyed this? Please do consider supporting #RailNatter at https://patreon.com/garethdennis or throw loose change at me via https://paypal.me/garethdennis. Join in the discussion at https://garethdennis.co.uk/discord.

Episode metadata supplied by the publisher feed · Published Oct 13, 2021

Embed this episode

NOW PLAYING

#RailNatter Episode 83: How do you fit bigger trains on the British railway network?

0:00 1:51:44

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of #Railnatter?

This episode is 1 hour and 51 minutes long.

When was this #Railnatter episode published?

This episode was published on October 13, 2021.

Can I download this #Railnatter episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!