EPISODE · Aug 13, 2026 · 4 MIN
Realistic Project Timelines Need Built-In Flexibility
from ByteSized · host kylerturnbull
Even the best project plans have to account for competing priorities, unexpected disruptions, and limited team capacity. In this episode, we discuss how leaders can set ambitious targets while building enough flexibility into execution to keep projects moving when reality disrupts the plan. Watch the full episode here: https://youtube.com/live/TutA0-pjM-Y Connect with me on LinkedIn https://www.linkedin.com/in/kylercheatham/ Follow me on Instagram https://www.instagram.com/kyler_cheatham_tech/ Follow me on TikTok https://www.tiktok.com/@kylercheatham Connect with The Confluencial https://www.linkedin.com/company/the-confluencial Follow The Confluencial on TikTok: https://www.tiktok.com/@the.confluencial
Embed this episode
Ready to play
Realistic Project Timelines Need Built-In Flexibility
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.