Rebuilding a bridge in 27 days—the Norfolk Southern story episode artwork

EPISODE · Dec 19, 2019 · 15 MIN

Rebuilding a bridge in 27 days—the Norfolk Southern story

from Rail Group On Air · host RT&S, Railway Age, IRJ

Flooding put pressure on a Norfolk Southern rail bridge in Brunswick, Mo., in October, and crews had to find a way to take the span down and rebuild as quickly as possible.

Flooding put pressure on a Norfolk Southern rail bridge in Brunswick, Mo., in October, and crews had to find a way to take the span down and rebuild as quickly as possible.

NOW PLAYING

Rebuilding a bridge in 27 days—the Norfolk Southern story

0:00 15:10

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Rail Group On Air?

This episode is 15 minutes long.

When was this Rail Group On Air episode published?

This episode was published on December 19, 2019.

What is this episode about?

Flooding put pressure on a Norfolk Southern rail bridge in Brunswick, Mo., in October, and crews had to find a way to take the span down and rebuild as quickly as possible.

Can I download this Rail Group On Air episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!