Red Card Segment Ep. 5: Change Orders VS Oral Surgeon
from Synergy Practices Dental Podcast Hosted by Arminco Inc
n this week's Red Card segment, we come to you with a story from Texas. An oral surgeon reached out asking for help. They are in the middle of construction on a 4,000 square-foot area located on the first floor of a two-story building. The oral surgeon mentiond that they are "tired of receiving non stop change orders". We share our take, and how we would go about solving this issue.
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of Synergy Practices Dental Podcast?
This episode is 11 minutes long.
When was this Synergy Practices Dental Podcast episode published?
This episode was published on December 22, 2020.
Can I download this Synergy Practices Dental Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.