Skip to content
Redesigning Nuclear Reactors for Mass Manufacturing with Aalo episode artwork

May 19, 2025 42 min

Redesigning Nuclear Reactors for Mass Manufacturing with Aalo

from Inevitable Hosted by Matt Loszak, Cody Simms

Matt Loszak is CEO and co-founder of Aalo Atomics, a startup designing 50-megawatt nuclear power plants made of pods of five 10-megawatt reactors each, targeting the data center market. Inspired by the MARVEL test reactor that his CTO Yasir Arafat led at Idaho National Lab, Aalo pursues parallel DOE and NRC pathways, betting that factory-built, pad-ready nuclear plants can slash cost, schedule, and grid-interconnection delays. Now 45 teammates strong and raising a Series B, Aalo aims to break ground on its first plant within 12 months and go critical the year after, powering the AI era with compact, clean, always-on fission. In this episode, we cover: [02:31] From SaaS to fission: Matt's founder journey [07:08] Yasir’s path and the Marvel reactor at INL [08:56] How national labs help launch commercial nuclear [12:12] Aalo’s dual regulatory path: DOE + NRC [13:45] Why Aalo is building reactors for data centers [17:19] Designing for mass manufacturing, not megaprojects [21:50] Security differences across nuclear facility types [25:03] Fuel and enrichment: what Aalo had to consider [28:02] Switching to LEU+ for supply chain resilience [31:04] Comparing XMRs, SMRs, and micro‑reactors [33:25] Inside the Aalo Pod: 5 x 10MW modules with built-in redundancy [37:15] Regulatory updates on NRC civilian licensing [38:43] Nuclear + AI: mutually transformative technologies [41:35] Hiring at Aalo: who they need next Episode recorded on April 23, 2025 (Published on May 19, 2025) Enjoyed this episode? Please leave us a review! Share feedback or suggest future topics and guests at [email protected]. Connect with Override: Cody Simms on LinkedIn Visit ovr.vc Subscribe to the Override Newsletter *Editing and post-production work for this episode was provided by The Podcast Consultant

Episode details come from the podcast's RSS feed.

Embed this episode

Matt Loszak is CEO and co-founder of Aalo Atomics, a startup designing 50-megawatt nuclear power plants made of pods of five 10-megawatt reactors each, targeting the data center market. Inspired by the MARVEL test reactor that his CTO Yasir Arafat led at Idaho National Lab, Aalo pursues parallel DOE and NRC pathways, betting that factory-built, pad-ready nuclear plants can slash cost, schedule, and grid-interconnection delays. Now 45 teammates strong and raising a Series B, Aalo aims to break ground on its first plant within 12 months and go critical the year after, powering the AI era with compact, clean, always-on fission.

Ready to play

Redesigning Nuclear Reactors for Mass Manufacturing with Aalo

0:00 42:54

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Inevitable?

This episode is 42 minutes long.

When was this Inevitable episode published?

This episode was published on May 19, 2025.

Can I download this Inevitable episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.