EPISODE · Mar 11, 2015 · 8 MIN
Relinking to Different File Paths
from The Flame Learning Channel · host Autodesk
If media has been moved from its original location, you will have to relink a sequence to the media. This video will go through the workflow of relinking to a partially linked sequence using the editable file paths in the Conform Event List.
Embed this episode
Ready to play
Relinking to Different File Paths
0:00
8:49
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of The Flame Learning Channel?
This episode is 8 minutes long.
When was this The Flame Learning Channel episode published?
This episode was published on March 11, 2015.
Can I download this The Flame Learning Channel episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!