Skip to content
Relinking to Different File Paths episode artwork

EPISODE · Mar 11, 2015 · 8 MIN

Relinking to Different File Paths

from The Flame Learning Channel · host Autodesk

If media has been moved from its original location, you will have to relink a sequence to the media. This video will go through the workflow of relinking to a partially linked sequence using the editable file paths in the Conform Event List.

Episode metadata supplied by the publisher feed · Published Mar 11, 2015

Embed this episode

Ready to play

Relinking to Different File Paths

0:00 8:49

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Flame Learning Channel?

This episode is 8 minutes long.

When was this The Flame Learning Channel episode published?

This episode was published on March 11, 2015.

Can I download this The Flame Learning Channel episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!