Reporteritund. Eleringi 900MW gaasielektrijaamade hankimise plaanist episode artwork

EPISODE · May 5, 2026 · 54 MIN

Reporteritund. Eleringi 900MW gaasielektrijaamade hankimise plaanist

from Reporteritund

Elering soovib elektrikatkestuse puhuks rajada taaskäivitamise teenuse hankega Eesti eri paikadesse 5-6 uut gaasielektrijaama koguvõimsusega kuni 900MW.

Episode metadata supplied by the publisher feed · Published May 5, 2026

Embed this episode

NOW PLAYING

Reporteritund. Eleringi 900MW gaasielektrijaamade hankimise plaanist

0:00 54:35

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Reporteritund?

This episode is 54 minutes long.

When was this Reporteritund episode published?

This episode was published on May 5, 2026.

Can I download this Reporteritund episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!