Reporteritund. Põlevkivitööstus episode artwork

EPISODE · Mar 5, 2020 · 54 MIN

Reporteritund. Põlevkivitööstus

from Reporteritund

Eesti Energia ja Viru Keemia Grupp peavad plaani rajada Ida-Viurmaale sadu miljoneid eurosid maksva põlevkivi eelrafineerimistehase. Samas on Eesti riik liikumas 2050. aastaks kliimaneutraalsuse suunas.

Episode metadata supplied by the publisher feed · Published Mar 5, 2020

Embed this episode

NOW PLAYING

Reporteritund. Põlevkivitööstus

0:00 54:16

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Reporteritund?

This episode is 54 minutes long.

When was this Reporteritund episode published?

This episode was published on March 5, 2020.

Can I download this Reporteritund episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!