EPISODE · Dec 11, 2018 · 54 MIN
Reporteritund. Rail Balticu ettevalmistuste seis aasta 2018 lõpul
from Reporteritund
Esmaspäeval olid Tallinnas koos Eesti, Leedu ja Poola transpordiministrid ning Soome ja Läti esindajad, kes arutasid Rail Balticu ehk siis 870 kilomeetri pikkuse kiire elektriraudtee rajamist Tallinnast Leedu-Poola piirini.Saates uurime, millises faasis on Rail Balticu ehituse ettevalmistused.
Embed this episode
NOW PLAYING
Reporteritund. Rail Balticu ettevalmistuste seis aasta 2018 lõpul
0:00
54:41
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Reporteritund?
This episode is 54 minutes long.
When was this Reporteritund episode published?
This episode was published on December 11, 2018.
Can I download this Reporteritund episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!