Skip to content
Residents Question Sewer Authority About Proposed WWTP episode artwork

EPISODE · Jan 26, 2025 · 15 MIN

Residents Question Sewer Authority About Proposed WWTP

from Mack's Newtown Voice · host Mack's Newtown Voice

At the 14 January 2025 Newtown Sewer Authority public meeting, residents from Middletown and Newtown had several questions regarding the proposed Waste Water Treatment Plant (WWTP, aka Sewerage Treatment Plant) on Lower Silver Lake Road abutting Middletown. One important question had to do with ACT 537, which currently provides: "The Township’s continued use and expansion of the Bucks County Water and Sewer Authority’s (BCWSA) conveyance system that includes the Neshaminy Interceptor for sewage conveyance to the City of Philadelphia’s Northeast Water Pollution Control Facility." This act would have to be modified by BOTH Newtown Township AND Newtown Borough to allow the use of a local sewage treatment plant that would send its effluent to Lake Luxembourg. Read "Water Treatment Expert Comments on Proposed Newtown WWTP"; https://rebrand.ly/RayPostonPatch

Episode metadata supplied by the publisher feed · Published Jan 26, 2025

Embed this episode

Ready to play

Residents Question Sewer Authority About Proposed WWTP

0:00 15:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Mack's Newtown Voice?

This episode is 15 minutes long.

When was this Mack's Newtown Voice episode published?

This episode was published on January 26, 2025.

Can I download this Mack's Newtown Voice episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!