Restoring the Agnes River - a 20 year project with an end in sight. episode artwork

EPISODE · Feb 17, 2022 · 35 MIN

Restoring the Agnes River - a 20 year project with an end in sight.

from gippslandscapes podcast · host West Gippsland Catchment Management Authority

This week, Gerard chats with landholder Brian Watterson about his 20 year project to turn a denuded 50 acres along the Agnes River into a reforested paradise. Brian is part of a wider community that has seen significant works done along the Agnes and helped to protect the Corner Inlet Ramsar listed ecosysuem downstream Topics discussed: History of the site and Brian's involvment Walkway plans amongst the landholders Landholder Trevor Mack The future of the area and reforestation Links mentioned in this episode: Video of Agnes River and restoration works: https://youtu.be/UixjWauzC90 A look at the previous work and planned works from the WGCMA https://www.wgcma.vic.gov.au/current-projects This podcast is hosted by ZenCast.fm

Episode metadata supplied by the publisher feed · Published Feb 17, 2022

Embed this episode

Ready to play

Restoring the Agnes River - a 20 year project with an end in sight.

0:00 35:32

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of gippslandscapes podcast?

This episode is 35 minutes long.

When was this gippslandscapes podcast episode published?

This episode was published on February 17, 2022.

Can I download this gippslandscapes podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!