Riot Platforms CEO Jason Les Q&A - Q3 Earnings & Data Center Expansion! episode artwork

EPISODE · Oct 31, 2025 · 1H

Riot Platforms CEO Jason Les Q&A - Q3 Earnings & Data Center Expansion!

from Power Analysis · host Anthony Power & Bryce McNallie

We break down Riot’s record Q3 and the strategy shift that turns low-cost power into high-value data centers. Jason Les explains how Corsicana scales to one gigawatt, why Rockdale stays productive, and how mining funds and balances the move into AI-grade colocation.• record revenue and margin drivers across mining and engineering• rising network difficulty versus low all-in power cost• the case for data centers as the highest return use of power• Rockdale’s bridge role and planned hash rate growth• Corsicana Core and Shell Plus and 56 MW data halls• leasing readiness without a signed anchor tenant• ERCOT hedges, pass-through power, and uptime needs• substation expansion timelines to 1 GW• PUE baseline targets and thermal strategy• mining as flexible load to cut stranded power• ESS Metron backlog and switchgear supply advantage• SG&A leverage and stock comp roll-off after Q3 2026• capital allocation, Bitfarms exit, and liquidity mix• project financing tied to tenant creditworthiness• valuation per megawatt and expected re-ratingStay tuned as Riot executes on the strategy here!Sign Up for Our Free Weekly Newsletter: https://www.powermininganalysis.com/newsletterAnthonys Info:Website:https://www.powermininganalysis.comX: https://twitter.com/cazenove_ukPatreon:https://www.patreon.com/Cazenove_UKBryce's Info:X:https://twitter.com/McnallieMPatreon:https://www.patreon.com/McNallieMoneyMerch:https://shop.mcnalliemoney.com/Website:https://www.mcnalliemoney.comBusiness Inquiries:Email - [email protected]

Episode metadata supplied by the publisher feed · Published Oct 31, 2025

Embed this episode

We break down Riot’s record Q3 and the strategy shift that turns low-cost power into high-value data centers. Jason Les explains how Corsicana scales to one gigawatt, why Rockdale stays productive, and how mining funds and balances the move into AI-grade colocation. • record revenue and margin drivers across mining and engineering • rising network difficulty versus low all-in power cost • the case for data centers as the highest return use of power • Rockdale’s bridge role and planned hash r...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

Riot Platforms CEO Jason Les Q&A - Q3 Earnings & Data Center Expansion!

0:00 1:00:44

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Power Analysis?

This episode is 1 hour and 0 minutes long.

When was this Power Analysis episode published?

This episode was published on October 31, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Power Analysis episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!