EPISODE · Jan 12, 2009 · 6 MIN
Risk Database
from 5 Minutes Podcast with Ricardo Vargas · host Ricardo Viana Vargas
In this podcast, Ricardo talks about the importance of documenting the project risks in a structured way the risks in order to generate a risk database. He also explains what information should be documented in the database. This podcast was recorded only in Brazilian Portuguese. The link below is for the Brazilian Portuguese version.
What this episode covers
In this podcast, Ricardo talks about the importance of documenting the project risks in a structured way the risks in order to generate a risk database. He also explains what information should be documented in the database. This podcast was recorded only in Brazilian Portuguese. The link below is for the Brazilian Portuguese version.
NOW PLAYING
Risk Database
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Jan 2, 2026 ·47m
Dec 21, 2025 ·46m