EPISODE · Mar 5, 2017 · 15 MIN
Riverkeeper
from Get Connected
Riverkeeper's President Paul Gallay on the impact of the closure Indian Point Nuclear Plant and where the EPA is headed under the new administration. Riverkeeper.comSee omnystudio.com/listener for privacy information.
Embed this episode
NOW PLAYING
Riverkeeper
0:00
15:18
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Get Connected?
This episode is 15 minutes long.
When was this Get Connected episode published?
This episode was published on March 5, 2017.
Can I download this Get Connected episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!