Road Closures and Delays as Intersection Improvements are Underway episode artwork

EPISODE · Oct 30, 2024 · 3 MIN

Road Closures and Delays as Intersection Improvements are Underway

from Durango Local News · host LNN Durango, Colorado

Colorado Department of Transportation and Durango and Silverton Narrow Gauge Railroad are continuing work on the US Highway 550, Main Street, and 14th Street intersection. As of Oct. 27, the intersection will be closed for about 11 days while D&SNGRR replaces the railroad tracks as part of overall safety improvements to the intersection, so be prepared to take alternative routes during the closure. An open call to artists in the Four Corners from the Durango-La Plata County Airport went out last week for three installations in the new baggage claim area. The selection committee will be looking for artwork featuring the Four Corners region's cultural, geographical, and historical diversity. Proposals are due by 3:00 p.m. Dec. 17. The City of Durango will begin construction on a new trail at Twin Buttes to create more accessible routes to two trails. The new trail will expand the terrain available for Class 1 E-Bikes and provide an alternative to the current challenging route connecting the Cliffrock Loop and Upper Twin Buttes Trail. By Hannah Robertson.  Watch this story at www.durangolocal.news/newsstories/road-closures-and-delays-as-intersection-improvements-are-underway    This story is sponsored by FASTSIGNS Durango and San Juan Regional Medical Center. Support the show

NOW PLAYING

Road Closures and Delays as Intersection Improvements are Underway

0:00 3:11

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Durango Local News?

This episode is 3 minutes long.

When was this Durango Local News episode published?

This episode was published on October 30, 2024.

What is this episode about?

Colorado Department of Transportation and Durango and Silverton Narrow Gauge Railroad are continuing work on the US Highway 550, Main Street, and 14th Street intersection. As of Oct. 27, the intersection will be closed for about 11 days while...

Can I download this Durango Local News episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!