Road Work Pause Until July | Bozeman News episode artwork

EPISODE · Jun 29, 2026 · 1 MIN

Road Work Pause Until July | Bozeman News

from Bozeman News Today | 2 Min News | The Daily News Now!

Missoula drivers, breathe easy—road work on South Reserve and Broadway is on pause until July. That chip seal and temporary lines? They’re curing, not crumbling. MDT’s paving plan is preserving seven miles of road, starting with crack sealing in June and now this chip seal to extend life. Crews return late July for final epoxy markings—just a few days, weather permitting. Stay tuned via 511mt.net or Tyler for alerts. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/a267f8a21315a673

NOW PLAYING

Road Work Pause Until July | Bozeman News

0:00 1:15

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Bozeman News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Bozeman News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on June 29, 2026.

What is this episode about?

Missoula drivers, breathe easy—road work on South Reserve and Broadway is on pause until July. That chip seal and temporary lines? They’re curing, not crumbling. MDT’s paving plan is preserving seven miles of road, starting with crack sealing...

Can I download this Bozeman News Today | 2 Min News | The Daily News Now! episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!