Skip to content
Rooftop Solar | FERC | E-Waste | Coal Decline | Clean Power Hour Ep.3 episode artwork

Apr 24, 2021 58 min

Rooftop Solar | FERC | E-Waste | Coal Decline | Clean Power Hour Ep.3

from Clean Power Hour Hosted by Tim Montague, Solar Expert, EV Owner

Send us Fan Mail Today on the Clean Power Hour this week we talk about: 1)We tour one of John's rooftop commercial solar projects; 2)FERC Order 841 and battery storage regulations; an investors view of a solar stock (Ameresco); 3)the growing problem of E-waste as the solar panel avalanche continues to grow. 4)Coal power plants are old and getting older and this is why so many of them are being retired (https://www.carbonbrief.org/mapped-worlds-coal-power-plants). 5)Michigan’s largest solar project - 1900 acre, $250 million dollar, Assembly Solar Project developed by Ranger Power is 20% complete (the 239 MW project is the largest in Michigan to date). Check out our podcast live interviews: www.cesnrg.com/podcast Check out John's blog: https://commercialsolarguy.com/news/ John on twitter: https://twitter.com/SolarInMASS Tim on twitter: https://twitter.com/tgmontague Support the show Connect with Tim Clean Power Hour Clean Power Hour on YouTube Tim on Twitter Tim on LinkedIn Email [email protected] Review Clean Power Hour on Apple Podcasts The Clean Power Hour is produced by the Clean Power Consulting Group and created by Tim Montague. Contact us by email: [email protected] Corporate sponsors who share our mission to speed the energy transition are invited to check out https://www.cleanpowerhour.com/support/ The Clean Power Hour is brought to you by CPS America, maker of North America’s number one 3-phase string inverter, with over 6GW shipped in the US. With a focus on commercial and utility-scale solar and energy storage, the company partners with customers to provide unparalleled performance and service. The CPS America product lineup includes 3-phase string inverters from 25kW to 275kW, exceptional data communication and controls, and energy storage solutions designed for seamless integration with CPS America systems. Learn more at www.chintpowersystems.com

Episode details come from the podcast's RSS feed.

Embed this episode

Send us Fan Mail Today on the Clean Power Hour this week we talk about: 1)We tour one of John's rooftop commercial solar projects; 2)FERC Order 841 and battery storage regulations; an investors view of a solar stock (Ameresco); 3)the growing problem of E-waste as the solar panel avalanche continues to grow. 4)Coal power plants are old and getting older and this is why so many of them are being retired (https://www.carbonbrief.org/mapped-worlds-coal-power-plants). 5)Michigan’s largest solar pr...

Ready to play

Rooftop Solar | FERC | E-Waste | Coal Decline | Clean Power Hour Ep.3

0:00 58:03

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Clean Power Hour?

This episode is 58 minutes long.

When was this Clean Power Hour episode published?

This episode was published on April 24, 2021.

Can I download this Clean Power Hour episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.