EPISODE · Apr 24, 2021 · 58 MIN
Rooftop Solar | FERC | E-Waste | Coal Decline | Clean Power Hour Ep.3
from Clean Power Hour · host Tim Montague, Solar Expert, EV Owner
Today on the Clean Power Hour this week we talk about: 1)We tour one of John's rooftop commercial solar projects; 2)FERC Order 841 and battery storage regulations; an investors view of a solar stock (Ameresco); 3)the growing problem of E-waste as the solar panel avalanche continues to grow. 4)Coal power plants are old and getting older and this is why so many of them are being retired (https://www.carbonbrief.org/mapped-worlds-coal-power-plants). 5)Michigan’s largest solar project - 1900 acre, $250 million dollar, Assembly Solar Project developed by Ranger Power is 20% complete (the 239 MW project is the largest in Michigan to date). Check out our podcast live interviews: www.cesnrg.com/podcastCheck out John's blog: https://commercialsolarguy.com/news/John on twitter: https://twitter.com/SolarInMASSTim on twitter: https://twitter.com/tgmontague Support the showConnect with Tim Clean Power Hour Clean Power Hour on YouTubeTim on TwitterTim on LinkedIn Email [email protected] Review Clean Power Hour on Apple PodcastsThe Clean Power Hour is produced by the Clean Power Consulting Group and created by Tim Montague. Contact us by email: [email protected] sponsors who share our mission to speed the energy transition are invited to check out https://www.cleanpowerhour.com/support/The Clean Power Hour is brought to you by CPS America, maker of North America’s number one 3-phase string inverter, with over 6GW shipped in the US. With a focus on commercial and utility-scale solar and energy storage, the company partners with customers to provide unparalleled performance and service. The CPS America product lineup includes 3-phase string inverters from 25kW to 275kW, exceptional data communication and controls, and energy storage solutions designed for seamless integration with CPS America systems. Learn more at www.chintpowersystems.com
What this episode covers
Today on the Clean Power Hour this week we talk about: 1)We tour one of John's rooftop commercial solar projects; 2)FERC Order 841 and battery storage regulations; an investors view of a solar stock (Ameresco); 3)the growing problem of E-waste as the solar panel avalanche continues to grow. 4)Coal power plants are old and getting older and this is why so many of them are being retired (https://www.carbonbrief.org/mapped-worlds-coal-power-plants). 5)Michigan’s largest solar project - 1900 acre...
NOW PLAYING
Rooftop Solar | FERC | E-Waste | Coal Decline | Clean Power Hour Ep.3
No transcript for this episode yet
Similar Episodes
Sep 29, 2023 ·76m
Sep 29, 2023 ·73m
Sep 29, 2023 ·72m
Sep 29, 2023 ·75m
Sep 29, 2023 ·75m
Sep 29, 2023 ·73m