Rota 235 - 23 08 2019
from Rota 235 Hosted by Rádio Hortênsias
Parque da Mônica Gramado será concluído até 2020 * Fábrica de calçados deve gerar 450 empregos em São Chico * Corsan anuncia obras em Canela e Gramado
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of Rota 235?
This episode is 10 minutes long.
When was this Rota 235 episode published?
This episode was published on August 23, 2019.
Can I download this Rota 235 episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.