EPISODE · May 2, 2025 · 48 MIN
Rural Route Radio May 2, 2025 Paul Hassink spent 40 years as a engineer in Public Utilities.
from Trent Loos Podcast · host Trent Loos
Let's talk about electric generation and transmission line placement.
Embed this episode
NOW PLAYING
Rural Route Radio May 2, 2025 Paul Hassink spent 40 years as a engineer in Public Utilities.
0:00
48:00
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Trent Loos Podcast?
This episode is 48 minutes long.
When was this Trent Loos Podcast episode published?
This episode was published on May 2, 2025.
Can I download this Trent Loos Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!