EPISODE · Sep 7, 2025 · 47 MIN
Rural Route Radio Sept 4, 2025 Wendy Volk with details about the planned wind development on top of Horse Creek Ranch in WY.
from Trent Loos Podcast · host Trent Loos
Today we learn of 110,000 acres in two Wyoming Counties that have permitting request for wind, solar and battery construction.
Embed this episode
Ready to play
Rural Route Radio Sept 4, 2025 Wendy Volk with details about the planned wind development on top of Horse Creek Ranch in WY.
0:00
47:49
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Trent Loos Podcast?
This episode is 47 minutes long.
When was this Trent Loos Podcast episode published?
This episode was published on September 7, 2025.
Can I download this Trent Loos Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!