EPISODE · Aug 18, 2026 · 2 MIN
Ryan Bridge $100m later, Auckland's still waiting for a second Harbour Crossing - Tue 18 Aug
from Ryan Bridge TODAY · host NZ Herald
The most galling part of that was the $50m spent on consultants for Labour's plan to put an almost $1 billion cycling bridge over the harbour.See omnystudio.com/listener for privacy information.
Embed this episode
NOW PLAYING
Ryan Bridge $100m later, Auckland's still waiting for a second Harbour Crossing - Tue 18 Aug
0:00
2:02
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Ryan Bridge TODAY?
This episode is 2 minutes long.
When was this Ryan Bridge TODAY episode published?
This episode was published on August 18, 2026.
Can I download this Ryan Bridge TODAY episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!