S03EP23: North Anna to Bristers Transmission Line Project episode artwork

EPISODE · Mar 30, 2026 · 58 MIN

S03EP23: North Anna to Bristers Transmission Line Project

from Stafford Connect Podcast

Griffis-Widewater supervisor Tinesha Allen meets with Tom to discuss the North Anna to Bristers electric transmission line project. Topics include the the purpose of the project, its proposed route, benefits and impacts, and procedures and timelines for input and decisions. A great discussion for those seeking basic information about the the project.

Episode metadata supplied by the publisher feed · Published Mar 30, 2026

Embed this episode

NOW PLAYING

S03EP23: North Anna to Bristers Transmission Line Project

0:00 58:09

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Stafford Connect Podcast?

This episode is 58 minutes long.

When was this Stafford Connect Podcast episode published?

This episode was published on March 30, 2026.

Can I download this Stafford Connect Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!