EPISODE · Mar 30, 2026 · 58 MIN
S03EP23: North Anna to Bristers Transmission Line Project
Griffis-Widewater supervisor Tinesha Allen meets with Tom to discuss the North Anna to Bristers electric transmission line project. Topics include the the purpose of the project, its proposed route, benefits and impacts, and procedures and timelines for input and decisions. A great discussion for those seeking basic information about the the project.
Embed this episode
NOW PLAYING
S03EP23: North Anna to Bristers Transmission Line Project
0:00
58:09
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Stafford Connect Podcast?
This episode is 58 minutes long.
When was this Stafford Connect Podcast episode published?
This episode was published on March 30, 2026.
Can I download this Stafford Connect Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!