S1 Episode 3 - Gone Fission Nuclear Report  11/22/21 Dr. Harold Conner, UCOR Sr Advisor & Former K-25 Plant Manager episode artwork

EPISODE · Nov 22, 2021 · 31 MIN

S1 Episode 3 - Gone Fission Nuclear Report 11/22/21 Dr. Harold Conner, UCOR Sr Advisor & Former K-25 Plant Manager

from Gone Fission Nuclear Report · host Michael Butler

In this week's report, Savannah River Site officials say a "very, very small" portion of the workforce elected not to get the COVID vaccine, resulting in some retirements, resignations or terminations.  A change in the way the Waste Isolation Pilot Plant (WIPP) counts waste volume shifts the repository from being half full to only a third full.  At Hanford, the Tank Side Cesium Removal (TSCR) system moves from testing to operations.  And a protest has been filed in the $8.3 billion contract award to UCOR for cleanup of the Oak Ridge Reservation.Plus, you'll enjoy an interview with Dr. Harold Conner, whose 50-year career went full circle from plant manager at the Oak Ridge Gaseous Diffusion Plant to a director in the world's first cleanup of a gaseous diffusion complex.Visit the Gone Fission Nuclear Report channel on youtube.com for a videocast of  episodes since November 7, 2022.

Episode metadata supplied by the publisher feed · Published Nov 22, 2021

Embed this episode

In this week's report, Savannah River Site officials say a "very, very small" portion of the workforce elected not to get the COVID vaccine, resulting in some retirements, resignations or terminations. A change in the way the Waste Isolation Pilot Plant (WIPP) counts waste volume shifts the repository from being half full to only a third full. At Hanford, the Tank Side Cesium Removal (TSCR) system moves from testing to operations. And a protest has been filed in the $8.3 bil...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

S1 Episode 3 - Gone Fission Nuclear Report 11/22/21 Dr. Harold Conner, UCOR Sr Advisor & Former K-25 Plant Manager

0:00 31:36

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Gone Fission Nuclear Report?

This episode is 31 minutes long.

When was this Gone Fission Nuclear Report episode published?

This episode was published on November 22, 2021.

Can I download this Gone Fission Nuclear Report episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!