S10 E299: No Damage for Delay Holds in Value Engineering Job with Scott Jennings episode artwork

EPISODE · Oct 29, 2025 · 11 MIN

S10 E299: No Damage for Delay Holds in Value Engineering Job with Scott Jennings

from Build America Podcast · host Scott Jennings

Welcome back to the Build America Podcast, where host Scott Jennings brings you unfiltered, no-BS insights into the world of construction. In this episode, Scott breaks down a real-life legal case that combines four critical construction contract concepts every contractor should understand: Value Engineering, Reservation of Rights, No Damage for Delay, and Cardinal Change.Through a detailed case study between a major contractor and the New York City DOT, Scott explains what went wrong, why “no damage for delay” clauses can be devastating for contractors, and how to protect yourself before signing that next change order. You’ll also learn why reading the fine print is non-negotiable — and how even seasoned pros can get tripped up if they don’t.Whether you’re a contractor, project manager, or construction executive, this episode will help you navigate risk, protect profits, and stay one step ahead of costly legal traps.What “No Damage for Delay” really means — and why it mattersHow Value Engineering can be profitable (if done right)Why a “Reservation of Rights” letter may not actually protect youThe definition of a Cardinal Change and when it appliesKey takeaways from a real court decision that ruled against the contractorPractical advice for reading contracts and avoiding financial lossScott Jennings is a seasoned heavy civil construction professional, company owner, author, and host of the Build America Podcast — a show dedicated to real-world lessons from decades in the field. His mission? To help you build smarter, safer, and more profitably.Learn more at: buildamericablog.com (add your actual site link)Check out Scott’s book series on Amazon: Build America & Ted the Termite📲 Listen & SubscribeIf you enjoyed this episode, don’t forget to:👍 Like this video🔔 Subscribe for more construction insights💬 Comment below with your thoughts or experiences📢 Share with your team or fellow contractors💡 In This Episode We Discuss:🧰 About the Host📚 Resources📲 Listen & Subscribe#BuildAmericaPodcast #ConstructionLaw #ConstructionManagement #NoDamageForDelay #ValueEngineering #CardinalChange #ReservationOfRights #ConstructionContracts #ProjectManagement #ConstructionIndustry #Contractors #Infrastructure #CivilConstruction #ConstructionClaims #RiskManagement #HeavyCivil #ConstructionProjects #LegalInsights #ScottJennings #WorkSafe

Episode metadata supplied by the publisher feed · Published Oct 29, 2025

Embed this episode

NOW PLAYING

S10 E299: No Damage for Delay Holds in Value Engineering Job with Scott Jennings

0:00 11:47

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Build America Podcast?

This episode is 11 minutes long.

When was this Build America Podcast episode published?

This episode was published on October 29, 2025.

Can I download this Build America Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!