Skip to content
S2. Ep. 72: Avoiding Project Cost Overruns (With Jerry Aliberti) episode artwork

Jun 26, 2023 22 min

S2. Ep. 72: Avoiding Project Cost Overruns (With Jerry Aliberti)

from Specified: Building Materials & Construction Growth Podcast Hosted by Tatsuya Nakagawa

Jerry Aliberti is the Principal at Pro-Accel. In this episode of Specified Growth Podcast, Jerry talks about his entrepreneurial journey, and what he’s learned from his many years in the construction industry. He also discusses his desire to help people at a more personal level, some of the mistakes new entrepreneurs make, how to effectively hire new talent and delegate tasks, avoiding cost overrun on your project, and much more. Don’t miss this episode of Specified Growth Podcast! Please reach out if you have any feedback or questions. Enjoy! Twitter: @TatsuyaNakagawa Instagram: @tats_talks LinkedIn: Tatsuya Nakagawa YouTube: Tats Talks www.tatstalk.com www.castagra.com

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

S2. Ep. 72: Avoiding Project Cost Overruns (With Jerry Aliberti)

0:00 22:35

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Specified: Building Materials & Construction Growth Podcast?

This episode is 22 minutes long.

When was this Specified: Building Materials & Construction Growth Podcast episode published?

This episode was published on June 26, 2023.

Can I download this Specified: Building Materials & Construction Growth Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.