S2 Episode 6 Gone Fission Nuclear Report 02/07/22 All-Hanford Report TSCR/TRIDEC David Reeploeg episode artwork

EPISODE · Feb 7, 2022 · 35 MIN

S2 Episode 6 Gone Fission Nuclear Report 02/07/22 All-Hanford Report TSCR/TRIDEC David Reeploeg

from Gone Fission Nuclear Report · host Michael Butler

This week the Gone Fission Nuclear Report podcast features an All-Hanford episode.  You'll hear from DOE and Washington River Protection Solutions (WRPS) officials and some of Washington State's top elected officials as WRPS begins operation of the Tank Side Cesium Removal (TSCR) system, a milestone in the Hanford site's tqnk waste cleanup program. Our Spotlight Interview features David Reeploeg, Vice President for Federal Affairs for the Tri-City Development Council (TRiDEC) in Kennewick, Washington. Enjoy this special All-Hanford episode of the Gone Fission Nuclear Report.  And visit www.gonefissionpodcast.comVisit the Gone Fission Nuclear Report channel on youtube.com for a videocast of  episodes since November 7, 2022.

Episode metadata supplied by the publisher feed · Published Feb 7, 2022

Embed this episode

NOW PLAYING

S2 Episode 6 Gone Fission Nuclear Report 02/07/22 All-Hanford Report TSCR/TRIDEC David Reeploeg

0:00 35:07

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Gone Fission Nuclear Report?

This episode is 35 minutes long.

When was this Gone Fission Nuclear Report episode published?

This episode was published on February 7, 2022.

Can I download this Gone Fission Nuclear Report episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!