S3E2 Gone Fission Nuclear Report - 01/09/23 - Oak Ridge Adds On-Site Waste Disposal - Roger Petrie, DOE-OR Regulatory Affairs Specialist episode artwork

EPISODE · Jan 11, 2023 · 1H 3M

S3E2 Gone Fission Nuclear Report - 01/09/23 - Oak Ridge Adds On-Site Waste Disposal - Roger Petrie, DOE-OR Regulatory Affairs Specialist

from Gone Fission Nuclear Report · host Michael Butler

Department of Energy cleanup sites across the country depend on on-site disposal facilities to handle contaminated waste and debris from demolished buildings and soil remediation. At one site--Oak Ridge, where a massive gaseous diffusion complex was completely demolished for the first time ever--more disposal capacity is needed to finish cleanup work at Oak Ridge National Laboratory and the Y-12 Nuclear Security Complex. In this week's episode, the Gone Fission Nuclear Report talks with Roger Petrie, DOE Regulatory Affairs Specialist, about what's involved in siting a second on-site disposal facility and the outlook for this vital resource being available when needed. Plus, see how one college nuclear engineering major has made it big on the national stage.Visit the Gone Fission Nuclear Report channel on youtube.com for a videocast of  episodes since November 7, 2022.

Episode metadata supplied by the publisher feed · Published Jan 11, 2023

Embed this episode

Department of Energy cleanup sites across the country depend on on-site disposal facilities to handle contaminated waste and debris from demolished buildings and soil remediation. At one site--Oak Ridge, where a massive gaseous diffusion complex was completely demolished for the first time ever--more disposal capacity is needed to finish cleanup work at Oak Ridge National Laboratory and the Y-12 Nuclear Security Complex. In this week's episode, the Gone Fission Nuclear Report talks with Roger...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

S3E2 Gone Fission Nuclear Report - 01/09/23 - Oak Ridge Adds On-Site Waste Disposal - Roger Petrie, DOE-OR Regulatory Affairs Specialist

0:00 1:03:10

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Gone Fission Nuclear Report?

This episode is 1 hour and 3 minutes long.

When was this Gone Fission Nuclear Report episode published?

This episode was published on January 11, 2023.

Can I download this Gone Fission Nuclear Report episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!