S3E8 Gone Fission Nuclear Report - 03/27/2023 - SRS Cleanup: Building Saltstone Disposal Units, Charles Comeau, DOE-SRS episode artwork

EPISODE · Mar 27, 2023 · 30 MIN

S3E8 Gone Fission Nuclear Report - 03/27/2023 - SRS Cleanup: Building Saltstone Disposal Units, Charles Comeau, DOE-SRS

from Gone Fission Nuclear Report · host Michael Butler

The Department of Energy’s Savannah River Site is engaged in a comprehensive cleanup program for liquid radioactive waste. 51 underground carbon-steel tanks were built to hold radioactive liquid waste from Cold War-era nuclear weapons production. Eight of the tanks have been emptied and closed. The remaining 43 tanks contain about 34 million gallons of liquid waste. In this week’s episode of the Gone Fission Nuclear Report podcast, we interview Charles Comeau, SRS Federal Project Director for Saltstone Disposal Unit Construction. We discuss the SRS waste cleanup program, focusing on the critical importance of mega-volume Saltstone Disposal Units now under construction and their central role in successful mission completion.Visit the Gone Fission Nuclear Report channel on youtube.com for a videocast of  episodes since November 7, 2022.

Episode metadata supplied by the publisher feed · Published Mar 27, 2023

Embed this episode

The Department of Energy’s Savannah River Site is engaged in a comprehensive cleanup program for liquid radioactive waste. 51 underground carbon-steel tanks were built to hold radioactive liquid waste from Cold War-era nuclear weapons production. Eight of the tanks have been emptied and closed. The remaining 43 tanks contain about 34 million gallons of liquid waste. In this week’s episode of the Gone Fission Nuclear Report podcast, we interview Charles Comeau, SRS Federal Project Director for...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

S3E8 Gone Fission Nuclear Report - 03/27/2023 - SRS Cleanup: Building Saltstone Disposal Units, Charles Comeau, DOE-SRS

0:00 30:20

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Gone Fission Nuclear Report?

This episode is 30 minutes long.

When was this Gone Fission Nuclear Report episode published?

This episode was published on March 27, 2023.

Can I download this Gone Fission Nuclear Report episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!