S5E6 TVA: Building an SMR at Clinch River - 9/22/2025 - Greg Boerschig, TVA Vice President episode artwork

EPISODE · Sep 22, 2025 · 27 MIN

S5E6 TVA: Building an SMR at Clinch River - 9/22/2025 - Greg Boerschig, TVA Vice President

from Gone Fission Nuclear Report · host Michael Butler

The 2025 Nuclear Opportunities Workshop sponsored by the East Tennessee Economic Council in Knoxville continues to yield newsworthy stories for the Gone Fission podcast.  This week, host Michael Butler talks with Tennessee Valley Authority Vice President Greg Borschieg about TVA's plans to build a small modular reactor on the Clinch River site in Oak Ridge.  In May, TVA became the first American utility to apply for a construction permit to build an SMR.  Learn more about this groundbreaking project in this week's episode of the Gone Fission podcast.Visit the Gone Fission Nuclear Report channel on youtube.com for a videocast of  episodes since November 7, 2022.

Episode metadata supplied by the publisher feed · Published Sep 22, 2025

Embed this episode

NOW PLAYING

S5E6 TVA: Building an SMR at Clinch River - 9/22/2025 - Greg Boerschig, TVA Vice President

0:00 27:03

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Gone Fission Nuclear Report?

This episode is 27 minutes long.

When was this Gone Fission Nuclear Report episode published?

This episode was published on September 22, 2025.

Can I download this Gone Fission Nuclear Report episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!