Scarborough Subway Tunnel at 75% | Toronto News episode artwork

EPISODE · Aug 3, 2026 · 1 MIN

Scarborough Subway Tunnel at 75% | Toronto News

from Toronto News Today | 2 Min News | The Daily News Now!

The Scarborough Subway Extension is roaring ahead, hitting 75% completion on its massive 8-kilometer tunnel—the widest in Canada at nearly 11 meters wide. Built as a single bore, it’ll carry trains in both directions through a cavernous tunnel big enough to fit a three-story building. To keep construction flowing, engineers installed a 108-meter “California Switch” to shuttle materials seamlessly. Though riders won’t see it until 2030, this project will replace the aging Scarborough RT, linking Kennedy to Sheppard and McCowan—and reshaping transit for the future. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/fcde24125a3146ed

Episode metadata supplied by the publisher feed · Published Aug 3, 2026

Embed this episode

NOW PLAYING

Scarborough Subway Tunnel at 75% | Toronto News

0:00 1:37

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Toronto News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Toronto News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on August 3, 2026.

Can I download this Toronto News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!