EPISODE · Aug 7, 2026 · 1 MIN
Scotland’s Biggest Battery Site Unveiled | Glasgow News
from Glasgow News Today | 2 Min News | The Daily News Now!
Construction is officially kicking off on Scotland’s biggest battery storage project yet — Windyhill, near Glasgow, set to power 55,000 homes and stabilize the grid with 200MW/400MWh capacity by early 2028. Designed to store excess renewable energy and release it during peak demand, this smart infrastructure avoids wasting clean power while creating 60 jobs. Led by Mitie (with 40+ UK battery sites under their belt) and powered by Revera Energy’s tech, Windyhill is a major leap toward a reliable, green energy future — and Phase 2 is already in the works. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/76afb79dccfb728e
Embed this episode
NOW PLAYING
Scotland’s Biggest Battery Site Unveiled | Glasgow News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.