EPISODE · Jun 24, 2026
SE Blair Road Closes in July for Major Reconstruction
Clark County Public Works will fully close a 200-foot section of Southeast Blair Road between Southeast Krohn and Washougal River roads from early July through the end of August. The 1.44-mile project includes repaving, curve banking improvements, guardrail replacement, and a bridge rail upgrade over the Little Washougal River. https://www.clarkcountytoday.com/news/road-closures-begin-in-july-for-reconstruction-of-southeast-blair-road/ #SoutheastBlairRoad #ClarkCounty #RoadClosure #ClarkCountyPublicWorks #Vancouver #Washougal #Transportation #RoadConstruction
What this episode covers
Clark County Public Works will fully close a 200-foot section of Southeast Blair Road between Southeast Krohn and Washougal River roads from early July through the end of August. The 1.44-mile project includes repaving, curve banking improvements, guardrail replacement, and a bridge rail upgrade over the Little Washougal River. https://www.clarkcountytoday.com/news/road-closures-begin-in-july-for-reconstruction-of-southeast-blair-road/ #SoutheastBlairRoad #ClarkCounty #RoadClosure #ClarkCountyPublicWorks #Vancouver #Washougal #Transportation #RoadConstruction
NOW PLAYING
SE Blair Road Closes in July for Major Reconstruction
No transcript for this episode yet
Similar Episodes
Apr 21, 2026 ·13m
Apr 19, 2026 ·16m
Apr 17, 2026 ·13m
Apr 13, 2026 ·11m
Apr 11, 2026 ·16m