EPISODE · Jan 25, 2023 · 14 MIN
Se retrasa la obra de las instalaciones deportivas de Guadarrama.
from Directo Marca Sierra
Los clubes de fútbol de la localidad no pueden utilizar el campo debido al retraso en la instalación de la nueva pista de atletismo. El PSOE de la localidad exige una solución, Su portavoz Javier Ortega lo expone.
Embed this episode
Ready to play
Se retrasa la obra de las instalaciones deportivas de Guadarrama.
0:00
14:00
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Directo Marca Sierra?
This episode is 14 minutes long.
When was this Directo Marca Sierra episode published?
This episode was published on January 25, 2023.
Can I download this Directo Marca Sierra episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!