SE VIENE LA RUTA CRÍTICA DE LOS DOS EQUIPOS DE CASA episode artwork

EPISODE · Aug 10, 2022 · 38 MIN

SE VIENE LA RUTA CRÍTICA DE LOS DOS EQUIPOS DE CASA

from Hablando de Futbol con Mario Ortega · host MARIO ORTEGA

HEF RADIO AGO 10

Episode metadata supplied by the publisher feed · Published Aug 10, 2022

Embed this episode

Ready to play

SE VIENE LA RUTA CRÍTICA DE LOS DOS EQUIPOS DE CASA

0:00 38:03

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Hablando de Futbol con Mario Ortega?

This episode is 38 minutes long.

When was this Hablando de Futbol con Mario Ortega episode published?

This episode was published on August 10, 2022.

Can I download this Hablando de Futbol con Mario Ortega episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!