Skip to content
Sears Island:  Mitigating allows Mutilating the Penobscot river/bay interface episode artwork

Feb 17, 2009 17 min

Sears Island: Mitigating allows Mutilating the Penobscot river/bay interface

from Penobscot Bay podcast Hosted by Penobscot Bay Report

This is a shorter reposting of BayWatch talking by phone to Harlan McLaughlin, president of Fair Play for Sears Island. Harlan explains the mitigation process that the MDOT hopes to foist over Mainers with the help of the Army Corps of Engineers. We commiserate over what a mess the Maine Chapter of the Sierra Club has made of Sears Island by teaming up with the Maine Dept of Transportation. As always, the sounds of Penobscot Bay interweave...

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Sears Island: Mitigating allows Mutilating the Penobscot river/bay interface

0:00 17:41

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Penobscot Bay podcast?

This episode is 17 minutes long.

When was this Penobscot Bay podcast episode published?

This episode was published on February 17, 2009.

Can I download this Penobscot Bay podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.