EPISODE · Jul 22, 2026 · 1 MIN
SEPTA to run Norristown High Speed Line shuttles during August bridge maintenance
from KYW Newsradio Audio On-Demand
Shuttle buses return to part of the Norristown High Speed Line next month, as crews resume their work on the aging Bridgeport Viaduct. KYW Newsradio's Mike DeNardo reports. (Photo provided by SEPTA.)
Embed this episode
NOW PLAYING
SEPTA to run Norristown High Speed Line shuttles during August bridge maintenance
0:00
1:07
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of KYW Newsradio Audio On-Demand?
This episode is 1 minute long.
When was this KYW Newsradio Audio On-Demand episode published?
This episode was published on July 22, 2026.
Can I download this KYW Newsradio Audio On-Demand episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!