Skip to content
SERGIO MONTIEL (SANCOR) episode artwork

EPISODE · Jul 14, 2016 · 12 MIN

SERGIO MONTIEL (SANCOR)

from Podcast de Emiliano Nunia

¿SE CIERRA LA SANCOR DE SAN GUILLERMO? Ante los rumores que ganaron la calle sobre un posible cierre de la Planta Industrial Sancor de San Guillermo consultamos a Sergio Montiel, encargado de Relaciones Institucionales de Sancor. "De ninguna manera estamos pensando en cerrar la planta de Sancor en San Guillermo´ dijo Montiel en "La Mañana de TvCoop Cooptel".

Episode metadata supplied by the publisher feed · Published Jul 14, 2016

Embed this episode

Ready to play

SERGIO MONTIEL (SANCOR)

0:00 12:25

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Podcast de Emiliano Nunia?

This episode is 12 minutes long.

When was this Podcast de Emiliano Nunia episode published?

This episode was published on July 14, 2016.

Can I download this Podcast de Emiliano Nunia episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!