Seven Years Later: The Dakota Access Pipeline Environmental Impact Statement episode artwork

EPISODE · Dec 7, 2023 · 36 MIN

Seven Years Later: The Dakota Access Pipeline Environmental Impact Statement

from Drilled · host Pushkin Industries

The U.S. Army Corps of Engineers closes the comment period on its draft Environmental Impact Statement for the Dakota Access Pipeline, a 1,172-mile pipeline that’s been pumping 500,000 barrels of oil per day since May 2017.The pipeline runs from the Bakken oil fields in North Dakota to southern Illinois, crossing the Missouri and Mississippi Rivers. Over the past six years, every court in the country has ruled that the Army Corps of Engineers did not study the pipeline’s environmental impact closely enough before approving the pipeline’s route. The Standing Rock Sioux Tribe has maintained all along that the project poses a serious threat to its drinking water. From April 2016 to February 2017 thousands of water protectors from all over the country joined them in protests and direct actions. The resistance at Standing Rock is often cited by the fossil fuel industry, police, and politicians as the reason states need new anti-protest laws, while the backlash to that resistance is often cited by water protectors as the reason for PTSD, asthma, and in some cases lost eyes and limbs.Now, the Army Corps of Engineers says that removing the pipeline would be too damaging to the Missouri River and its surrounding ecosystems. The removal actions it describes in its EIS are the same actions taken to install the pipeline in the first place. The Army Corps suggests that removing the pipeline would be more environmentally harmful than allowing the oil to continue pumping under one of Standing Rock's primary drinking water sources. Nonetheless, this report—seven years late—represents one of the few pathways left to stop the pipeline.The Standing Rock Sioux Tribe is advocating to seal the pipeline off, while some water protectors are advocating for the pipeline to be removed entirely. The public comment period closes Dec 13, 2023.  See omnystudio.com/listener for privacy information.

Episode metadata supplied by the publisher feed · Published Dec 7, 2023

Embed this episode

NOW PLAYING

Seven Years Later: The Dakota Access Pipeline Environmental Impact Statement

0:00 36:31

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Drilled?

This episode is 36 minutes long.

When was this Drilled episode published?

This episode was published on December 7, 2023.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Drilled episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!