Sewer Upgrade in Flood Zones episode artwork

EPISODE · Jun 23, 2026 · 1 MIN

Sewer Upgrade in Flood Zones

from Bozeman News Today | 2 Min News | The Daily News Now!

Bozeman’s city crews are replacing 2,200 feet of aging sewer pipe as part of a major upgrade to the MSU Interceptor — but here’s the twist: some digging will happen right in floodplains and floodways along Figgins Creek and key intersections. Don’t worry — engineers have confirmed the new trench won’t raise flood levels during a 100-year storm. The city wants your voice: submit written feedback by July 10, 2026, via email or mail to the Floodplain Administrator. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/34a54a50ea8d0055

NOW PLAYING

Sewer Upgrade in Flood Zones

0:00 1:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Bozeman News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Bozeman News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on June 23, 2026.

What is this episode about?

Bozeman’s city crews are replacing 2,200 feet of aging sewer pipe as part of a major upgrade to the MSU Interceptor — but here’s the twist: some digging will happen right in floodplains and floodways along Figgins Creek and key intersections....

Can I download this Bozeman News Today | 2 Min News | The Daily News Now! episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!