Sewer Upgrade in Flood Zones episode artwork

EPISODE · Jun 23, 2026 · 1 MIN

Sewer Upgrade in Flood Zones

from Bozeman News Today | 2 Min News | The Daily News Now!

Bozeman’s city crews are replacing 2,200 feet of aging sewer pipe as part of a major upgrade to the MSU Interceptor — but here’s the twist: some digging will happen right in floodplains and floodways along Figgins Creek and key intersections. Don’t worry — engineers have confirmed the new trench won’t raise flood levels during a 100-year storm. The city wants your voice: submit written feedback by July 10, 2026, via email or mail to the Floodplain Administrator. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/34a54a50ea8d0055

Episode metadata supplied by the publisher feed · Published Jun 23, 2026

Embed this episode

NOW PLAYING

Sewer Upgrade in Flood Zones

0:00 1:28

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Bozeman News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Bozeman News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on June 23, 2026.

Can I download this Bozeman News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!