EPISODE · Apr 27, 2016 · 42 MIN
ShopTalk 360 Mystery Guest and Ehrsam on Change Orders
from ShopTalk 360 · host ShopTalk 360
ShopTalk 360 Mystery Guest and Ehrsam on Change Orders
Embed this episode
NOW PLAYING
ShopTalk 360 Mystery Guest and Ehrsam on Change Orders
0:00
42:39
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of ShopTalk 360?
This episode is 42 minutes long.
When was this ShopTalk 360 episode published?
This episode was published on April 27, 2016.
Can I download this ShopTalk 360 episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!