EPISODE · Nov 27, 2017 · 1H 14M
Short show today. Joe gives homeowner and contractor advice on the "oh by the ways"; change order implications in remodeling; and what is c
from The HomeFix Show · host Cumulus Boise
Embed this episode
Ready to play
Short show today. Joe gives homeowner and contractor advice on the "oh by the ways"; change order implications in remodeling; and what is c
0:00
1:14:26
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of The HomeFix Show?
This episode is 1 hour and 14 minutes long.
When was this The HomeFix Show episode published?
This episode was published on November 27, 2017.
Can I download this The HomeFix Show episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!