Shutdown is over, but airport delays are still expected episode artwork

EPISODE · Nov 14, 2025 · 23 MIN

Shutdown is over, but airport delays are still expected

from Austin Signal · host Jerry Quijano

The government shutdown may be over, but its impacts are still being felt across the country – including at Austin’s airport, which was already dealing with an air traffic controller shortage prior to the 43-day shutdown. Foreign exchange students in Texas schools could be prohibited from participating in varsity athletics in the near future after […] The post Shutdown is over, but airport delays are still expected appeared first on KUT & KUTX Studios -- Podcasts.

Episode metadata supplied by the publisher feed · Published Nov 14, 2025

Embed this episode

NOW PLAYING

Shutdown is over, but airport delays are still expected

0:00 23:30

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Austin Signal?

This episode is 23 minutes long.

When was this Austin Signal episode published?

This episode was published on November 14, 2025.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Austin Signal episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!