Signing a Change Order: What to look for episode artwork

EPISODE · Mar 12, 2020 · 7 MIN

Signing a Change Order: What to look for

from Build America Podcast · host Scott Jennings

Ensure that before you sign a change order, all of the necessary components of your negotiation are included. Here’s what to look for in a change order before you sign it. And don’t forget – you don’t have to sign it. http://sjcivil.net/contracts/signing-a-change-order-what-to-look-for/

Episode metadata supplied by the publisher feed · Published Mar 12, 2020

Embed this episode

NOW PLAYING

Signing a Change Order: What to look for

0:00 7:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Build America Podcast?

This episode is 7 minutes long.

When was this Build America Podcast episode published?

This episode was published on March 12, 2020.

Can I download this Build America Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!