EPISODE · Jun 10, 2026 · 27 MIN
Silver Tiger Metals (TSXV:SLVR) - El Tigre Build Advances Toward 2027 First Pour With $800M NPV
from Company Interviews · host Crux Investor
Interview with Glenn Jessome, President & CEO of Silver Tiger Metals Inc.Our previous interview: https://www.cruxinvestor.com/posts/silvers-designation-opens-support-pathways-as-advanced-projects-target-2026-milestonesRecording date: 6th June 2026Silver Tiger Metals has reached a major milestone at its El Tigre project in Sonora, securing the first Mexican construction permit granted to a foreign mining company since 2019. Now over three months into building a high-margin heap leach silver and gold mine, the project is fully funded by a recent USD 60 million financing round. With earthworks underway and a 50-person camp operational, the build currently remains ahead of schedule. Management anticipates the first doré pour by December 2027, officially transitioning the firm from a development-stage company into a near-term producer.The financial projections for El Tigre are highly compelling. At current spot prices, the surface heap leach mine boasts a standalone after-tax net present value of roughly USD 800 million, an internal rate of return of 92 percent, and generates USD 100 million annually over an initial 10-year life. Crucially, the company also released an assessment for an adjacent underground mine featuring a 15-year lifespan and a USD 830 million valuation. Unlike many Mexican epithermal deposits where surface mining blocks deeper extraction, El Tigre’s underground ore body lies entirely outside the surface footprint. This spatial advantage allows both operations to run concurrently, sharing infrastructure and drastically reducing the initial capital expenditure for the underground expansion.Beyond the established plan, Silver Tiger is aggressively pursuing exploration upside. Drilling has resumed on northern veins located 700 meters away, targeting an additional three million tonnes of silver equivalent. This expansion could nearly double the underground resource. Despite a recent dip in share price, the company views its current valuation as a massive discount to the combined theoretical project value of up to USD 1.8 billion. As the December 2027 production target approaches and debt providers actively compete to offer favorable financing terms, Silver Tiger is uniquely positioned to capitalize on a generational peak in precious metal prices.Learn more: https://www.cruxinvestor.com/companies/silver-tiger-metalsSign up for Crux Investor: https://cruxinvestor.com
What this episode covers
Interview with Glenn Jessome, President & CEO of Silver Tiger Metals Inc.Our previous interview: https://www.cruxinvestor.com/posts/silvers-designation-opens-support-pathways-as-advanced-projects-target-2026-milestonesRecording date: 6th June 2026Silver Tiger Metals has reached a major milestone at its El Tigre project in Sonora, securing the first Mexican construction permit granted to a foreign mining company since 2019. Now over three months into building a high-margin heap leach silver and gold mine, the project is fully funded by a recent USD 60 million financing round. With earthworks underway and a 50-person camp operational, the build currently remains ahead of schedule. Management anticipates the first doré pour by December 2027, officially transitioning the firm from a development-stage company into a near-term producer.The financial projections for El Tigre are highly compelling. At current spot prices, the surface heap leach mine boasts a standalone after-tax net present value of roughly USD 800 million, an internal rate of return of 92 percent, and generates USD 100 million annually over an initial 10-year life. Crucially, the company also released an assessment for an adjacent underground mine featuring a 15-year lifespan and a USD 830 million valuation. Unlike many Mexican epithermal deposits where surface mining blocks deeper extraction, El Tigre’s underground ore body lies entirely outside the surface footprint. This spatial advantage allows both operations to run concurrently, sharing infrastructure and drastically reducing the initial capital expenditure for the underground expansion.Beyond the established plan, Silver Tiger is aggressively pursuing exploration upside. Drilling has resumed on northern veins located 700 meters away, targeting an additional three million tonnes of silver equivalent. This expansion could nearly double the underground resource. Despite a recent dip in share price, the company views its current valuation as a massive discount to the combined theoretical project value of up to USD 1.8 billion. As the December 2027 production target approaches and debt providers actively compete to offer favorable financing terms, Silver Tiger is uniquely positioned to capitalize on a generational peak in precious metal prices.Learn more: https://www.cruxinvestor.com/companies/silver-tiger-metalsSign up for Crux Investor: https://cruxinvestor.com
NOW PLAYING
Silver Tiger Metals (TSXV:SLVR) - El Tigre Build Advances Toward 2027 First Pour With $800M NPV
No transcript for this episode yet
Similar Episodes
Mar 26, 2026 ·1m
Jan 2, 2026 ·47m
Dec 21, 2025 ·46m