Six years in and only 9 out of 77 miles of bike lanes are built | Joshua Emerson Smith episode artwork

EPISODE · Nov 19, 2019 · 15 MIN

Six years in and only 9 out of 77 miles of bike lanes are built | Joshua Emerson Smith

from San Diego News Fix · host San Diego News Fix

A year behind schedule and millions of dollars over budget, an ambitious plan by regional officials to build a sophisticated network of bicycle lanes and pedestrian crossings has proven more complicated than first anticipated. Obstacles include everything from neighborhood outrage at the loss of parking spaces to the technical challenges of overhauling streets designed primarily for cars. The San Diego Association of Governments — the agency undertaking the now-$279 million project — has found itself in the crosshairs of frustrated groups on all sides of the issue, from business associations to homeowners to supporters of cycling.

Episode metadata supplied by the publisher feed · Published Nov 19, 2019

Embed this episode

Ready to play

Six years in and only 9 out of 77 miles of bike lanes are built | Joshua Emerson Smith

0:00 15:29

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of San Diego News Fix?

This episode is 15 minutes long.

When was this San Diego News Fix episode published?

This episode was published on November 19, 2019.

Can I download this San Diego News Fix episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!