Skip to content
Solving Speed-to-Power and Future Grid Needs with Behind-the-Meter Generation episode artwork

Aug 28, 2026 30 min

Solving Speed-to-Power and Future Grid Needs with Behind-the-Meter Generation

from GridPulse, a Grid Forward podcast Hosted by gridforward

For large facilities scrambling to bring new energy capacity online, waiting several years for a new grid connection is not a viable option. John Carrington, CEO of ERock, and Jesse Noffsinger, Partner at McKinsey & Company, discuss current trends in behind-the-meter (BTM) generation and how it can provide a faster solution while utilities build needed grid connections. Over the long term however, BTM resources could shift from serving individual customers to supporting the larger power system. John and Jesse also explore the challenges that come with rapid growth on the grid, including supply chain constraints, complex large-load rate structures, and how costs and benefits should be shared. Hear two expert viewpoints on this fast-evolving BTM area in this episode.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Solving Speed-to-Power and Future Grid Needs with Behind-the-Meter Generation

0:00 30:39

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of GridPulse, a Grid Forward podcast?

This episode is 30 minutes long.

When was this GridPulse, a Grid Forward podcast episode published?

This episode was published on August 28, 2026.

Can I download this GridPulse, a Grid Forward podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.