South Florida General Contractors Scramble To Navigate New Labor, Tariff Reality episode artwork

EPISODE · Jan 30, 2026 · 1H 1M

South Florida General Contractors Scramble To Navigate New Labor, Tariff Reality

from Miami Real Estate Investing Podcast With Peter Zalewski · host Peter Zalewski

In this episode of Condo Capitalism™, general contractor Kevin Calienes discusses the current state of the South Florida construction industry where some laborers are asking as much as $300 per day.Condo Capitalism™ is a weekly podcast hosted by Peter Zalewski of the Miami Condo Investing Club™ that provides data-driven analysis on distressed real estate—foreclosures, shortsales and bank-owned REOs—in the tricounty South Florida region of Miami-Dade, Broward and Palm Beach.The program tracks the Florida Condo Association Financial Cliff, where rising maintenance fees, special assessments and insurance costs are squeezing cash-strapped owners.On the show, experts analyze how the national “two-sided risk”—rising inflation and falling employment—magnifies these local pressures, potentially forcing a capitulation by owners who can no longer afford condo living.Join Peter Zalewski at MiamiCondo.Club for a livestream every weekday at 4 pm (Miami time). On-demand recordings of all shows are available here.Episode OverviewIn the Jan. 29, 2026, episode of the Condo Capitalism™ podcast, host Peter Zalewski interviews general contractor Kevin Calienes of Khaos Construction in Coral Gables regarding the intensifying financial pressures facing South Florida development sites.The discussion centers on a market where laborers realizing they are in great demand are now asking for more money, with some setting a new $300 daily labor floor for skilled trades.While existing fixed-price contracts force general contractors to absorb the brunt of rising material tariffs, new project proposals are undergoing a necessary recalibration to reflect 2026 prices.During the 62-minute discussion, Calienes details a landscape where the cost of essential building materials like copper wiring has more than tripled, forcing a shift in how contractors bid and budget for future developments.The reality of building in Miami is changing as the basic costs for workers and supplies seem to move higher every month.Homeowners and developers are finding that the old prices they used to pay for simple renovations or new houses are disappearing.A shrinking pool of available laborers has turned traditional masonry into a bottleneck that is now too slow and too expensive for the local market.As fewer workers are available to lay heavy concrete blocks, project timelines are stretching and costs are rising.To keep projects moving along, Calienes said he is increasingly recommending faster, high-tech ways to build that require less manpower.This inflationary environment is driving a shift toward alternative building technologies like Insulated Concrete Form (ICF) systems, which replace traditional masonry with high-efficiency foam and concrete bunkers.The method allows a three-man crew to erect a 2,000 square foot structure in roughly four weeks. Traditional concrete block construction often requires two months or more to reach the same point in the construction.While these materials carry a 10% to 15% price premium, owners move in much sooner since the process skips several time-consuming government inspections.An added bonus for clients opting for these high-efficiency homes is the reported drop in power bills by about half. Calienes also cited reports of insurance costs falling significantly for these structures.One client reportedly saw his annual insurance premium fall from $19,000 to about $10,000.Switching to these smart materials is a way for the local building industry to stay competitive as the cost of labor and traditional supplies discover a price ceiling in South Florida.

Episode metadata supplied by the publisher feed · Published Jan 30, 2026

Embed this episode

NOW PLAYING

South Florida General Contractors Scramble To Navigate New Labor, Tariff Reality

0:00 1:01:47

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Miami Real Estate Investing Podcast With Peter Zalewski?

This episode is 1 hour and 1 minute long.

When was this Miami Real Estate Investing Podcast With Peter Zalewski episode published?

This episode was published on January 30, 2026.

Can I download this Miami Real Estate Investing Podcast With Peter Zalewski episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!