Southampton Town's Latest — and Hopefully Last — Draft of New BESS Codes episode artwork

EPISODE · May 22, 2025 · 42 MIN

Southampton Town's Latest — and Hopefully Last — Draft of New BESS Codes

from 27Speaks · host The Express News Group

With renewable energy sources like solar farms and windmills gaining traction on the East End, building facilities to store all that energy becomes vital. But battery energy storage systems (or BESS as they are called) are not without critics — especially given that some facilities around the country have experienced fires in the past. The Southampton Town Board recently introduced the fourth version of its BESS code and board members say it will be one of the most restrictive in the state. This week, the editors are joined by senior reporter Michael Wright to discuss the issues surrounding BESS and the details of Southampton’s new code for future such facilities.

Episode metadata supplied by the publisher feed · Published May 22, 2025

Embed this episode

NOW PLAYING

Southampton Town's Latest — and Hopefully Last — Draft of New BESS Codes

0:00 42:51

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of 27Speaks?

This episode is 42 minutes long.

When was this 27Speaks episode published?

This episode was published on May 22, 2025.

Can I download this 27Speaks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!