Skip to content
Space Rocket History #155 – Apollo 7 – Assembly, Testing, Training, and Launch episode artwork

Dec 6, 2019 26 min

Space Rocket History #155 – Apollo 7 – Assembly, Testing, Training, and Launch

from Space Rocket History Archive Hosted by Michael Annis

Command Service Module-101 started through the manufacturing cycle early in 1966. By July, it had been formed, wired, fitted with subsystems, and made ready for testing. After the Apollo 1 fire in January 1967, changes had to be made, mainly in the wiring, hatch areas, and the forward egress tunnel. It was December before the spacecraft came back into testing. CSM-101 passed through a three-phase customer acceptance review; during the third session, held in Downey on May 7th 1968, no items showed up that might be a “constraint to launch.” North American cleared up what few deficiencies there were (13) and shipped the craft to Kennedy on May 30th 1967…

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Space Rocket History #155 – Apollo 7 – Assembly, Testing, Training, and Launch

0:00 26:45

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Space Rocket History Archive?

This episode is 26 minutes long.

When was this Space Rocket History Archive episode published?

This episode was published on December 6, 2019.

Can I download this Space Rocket History Archive episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.